Horizontal drain runs
uPVC pipes graded to correct fall for each wet room and kitchen

Mubarak Al-Kabeer
Drain-line foundation work in Qosor demands exact height calculations before building starts. We run waste pipes at constant slope from every collection point toward the main septic chamber. Floor traps and vent stacks install before concrete pours. Every connection and angle gets full-pressure water testing.
Qosor homes in the south typically sit on firm clay soil, allowing deep excavation for collection chambers. We set floor traps in main collection zones and connect them with pipes sloping gradually toward the tank. Drainage slopes may need steps or gentle bends because initial elevation gain is often limited.
Qosor sits in southern Mubarak Al-Kabeer, a heavy-soil zone requiring careful testing before any pour.
We pump water through each drainage section for two hours before allowing pipes to be buried.
uPVC pipes graded to correct fall for each wet room and kitchen
vent column fitted to prevent trap siphoning and sewer odour indoors
cleanout positions fixed before burial so future maintenance needs no breaking
floor traps set at correct level before screed is poured over them
building drain lines connected to the external sewer at correct invert level
all drain lines water-tested before burial to confirm joints are sound
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, heavy soil means greater pipe pressure. We use thicker-wall pipes and add a sand bed underneath to distribute load evenly.
At least three times: after pipe installation, before concrete pours, and before site handover. Final testing occurs one week after the pour to confirm stability.