First-fix plumbing in Funaitees starts by running supply lines from roof tanks through load-bearing walls before dry lining. We set drain pipes on a steady fall toward sumps in the ground floor. Each branch ties to the main network and is pressure-tested before covering.
Funaitees is mid-rise residential with several flats and bathrooms per floor and common areas on the ground level. Supply comes from a central roof tank then branches to each flat, and drainage passes through a single vertical stack collecting from all floors. We install shut-off valves at each flat inlet for future repair access.
Funaitees sits near Mubarak Al-Kabeer governorate, a dense residential zone where shared pipes require precise design.
The main stack is tested with water running from all floors together to confirm the fall is adequate and no obstructions exist.
Coordinating pipe and conduit routes before walls are closed
Hot, cold and waste lines run to every sanitary point
Supply for sink, appliances and gas line inside the structure
Full pipe runs per unit including meter point positions
Drain lines laid to correct falls with proper vent stacks
Ground and roof tank connections integrated during structural stage
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.