Plumbing and electrics first-fix
Coordinating pipe and conduit routes before walls are closed

Farwaniya
First-fix plumbing in Khitan Al-Jadida starts with the house foundation weeks before concrete pours. We run cold supply, hot supply and drain lines through walls and floors and pressure-test every joint. Pipes and fittings are braced firmly so they do not move during concrete placement. Handover is leak-free and ready for the next phase.
Most Khitan Al-Jadida homes are newly built villas with open floor plans, each with three or more bathrooms spread across multiple storeys. That means main drainage runs drop from the first-floor ceiling to the foundation and need precise slope and spacing to prevent blockage after finishing. We install each drain pipe to the correct diameter and brush it clean before handover to ensure no debris inside.
Khitan Al-Jadida is in Farwaniya governorate, where rapid residential development of modern family villas is underway.
Every drain line is flushed under pressure before walls close because fixing a leak afterwards requires breaking tile and concrete.
Coordinating pipe and conduit routes before walls are closed
Hot, cold and waste lines run to every sanitary point
Supply for sink, appliances and gas line inside the structure
Full pipe runs per unit including meter point positions
Drain lines laid to correct falls with proper vent stacks
Ground and roof tank connections integrated during structural stage
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We brush each pipe with a correctly sized brush and cap it with a temporary plastic plug until handover. Concrete and sand debris cannot enter the pipes this way.
Pressure test uses compressed air to detect leaks from outside without damaging the structure. Water test comes later after finishing to confirm everything works under real flow.