Hot and cold supply
PPR runs sized for sink, dishwasher and fridge-water connections

Farwaniya
Kitchen plumbing in Dajeej faces the challenge of long runs in older detached houses. We lay supply, waste and vent from the roof tank through walls and ceilings before final construction.
Dajeej's desert houses are old with sandy natural ground and shallow foundations, and the kitchen may sit far from the roof tank room. We select insulated copper for hot supply because summer thermal expansion is severe. Waste must fall steadily and we may dig a shallow surface channel under sand near Dajeej houses to avoid deep digging.
Dajeej lies in Farwaniya governorate, a remote desert fringe area with scattered older detached houses far from central infrastructure.
Water pressure is tested before completion because long supply runs mean natural pressure drop.
PPR runs sized for sink, dishwasher and fridge-water connections
uPVC drain at correct fall to stop grease settling inside the pipe
Grease trap position and vent stack stub to block sewer odour entry
Gas supply stub-out to cooker position run before wall cladding closes
Supply and drain stub prepared at the right height for the water heater
Recorded pressure test on all supply lines before any wall is closed
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes but the hot line needs thick thermal insulation and larger pipe diameter to reduce friction loss. We fit a low drain point and test flow without opening pipes.
We use a large-diameter high-strength waste pipe and run it through clean sand under the foundation. We measure the fall before digging to ensure water slopes toward the external pit.
