Hot and cold supply
PPR runs sized for sink, dishwasher and fridge-water connections

Farwaniya
Kitchen first fix in Ardhiya Industrial starts before concrete is poured or partition walls are set. We run supply, waste and vent lines to the drawing and air-pressure-test every joint. Industrial kitchens need larger-bore pipes and steeper falls than residential ones.
Ardhiya factories and warehouses have worker kitchens of different sizes, some near the entry and others at the rear corner. We route pipes based on sink, stove and refrigerator positions and keep clear space under the slab for drain cleaning. Where the kitchen sits far from the main stack, we add a lift tank or small greywater pump to keep waste flowing steadily.
Ardhiya Industrial lies in Farwaniya governorate, where large factories and warehouses cluster along the Sixth Ring Road.
Before handover, we fill the pipes with water and hold pressure for one hour to check all joints for seepage.
PPR runs sized for sink, dishwasher and fridge-water connections
uPVC drain at correct fall to stop grease settling inside the pipe
Grease trap position and vent stack stub to block sewer odour entry
Gas supply stub-out to cooker position run before wall cladding closes
Supply and drain stub prepared at the right height for the water heater
Recorded pressure test on all supply lines before any wall is closed
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, if there is enough fall to the sump pit or lift tank. We check the fall before pouring and use large-bore PVC to avoid blockages in a kitchen where grease and food waste go down.
We run two separate lines under the slab, one for the kitchen and one for toilets, each with its own fall. Separation makes drain cleaning easier and stops smells backing up from the main stack.
