Hot and cold supply
PPR runs sized for sink, dishwasher and fridge-water connections

Jahra
Kitchen first-fix in Mutlaa requires careful study of natural terrain slope. We run supply from roof tank and position waste to align with ground's natural fall. Every joint is high-pressure tested and exposed pipes are protected from harsh climate swings in the area.
Mutlaa homes sit on ridges and slopes of sandstone hills, making drainage easier but requiring carving through hard rock. Roof tanks sit very high, giving strong pressure to supply lines. We choose pipe routes that avoid rock fissures and use copper pipes to withstand intense summer heat. Waste lines follow natural slope toward valley and distant sump.
Mutlaa sits on high ground in Jahra with rocky hills and natural slopes that aid drainage.
Supply pipes are tested at six bar pressure to withstand the extra pressure from elevated roof tanks.
PPR runs sized for sink, dishwasher and fridge-water connections
uPVC drain at correct fall to stop grease settling inside the pipe
Grease trap position and vent stack stub to block sewer odour entry
Gas supply stub-out to cooker position run before wall cladding closes
Supply and drain stub prepared at the right height for the water heater
Recorded pressure test on all supply lines before any wall is closed
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Copper withstands very high summer temperatures and high pressure from elevated tanks. Plastic can warp or crack in the area's harsh climate throughout the year.
Yes, we use powerful electric drills to bore through sandstone and pass waste pipes. After installation, holes are sealed with water-resistant cement to prevent seepage and collapse.
