Plumbing and electrics first-fix
Coordinating pipe and conduit routes before screed is poured

Jahra
First-fix plumbing and electrical in Mutlaa starts with new building frames before desert villa roofing. We run lines carefully across rough terrain and around rock outcrops, then leak-test and pressure-check before build-out.
On Mutlaa's rocky ridges, villas sit on deep rock-anchored foundations. Water and waste lines pass through foundations in heavy-duty protective metal sleeves. Dry wells are placed at low points to collect greywater before removal. Electrical conduits run high and clear of waste pipes because rock moisture affects insulation.
Mutlaa is a Jahra district known for rocky terrain and scenic natural landscape.
We cut conduit trenches in rock at 45 degrees to ensure rainwater does not pool above pipes.
Coordinating pipe and conduit routes before screed is poured
Drain, supply and power points set to exact fixture positions
Water, drain and electrical lines serving appliances and sinks
Full first-fix for units in multi-storey residential buildings
Drain pipes laid at correct falls with required vent openings
Ground tank, roof tank and pressure pump pipe connections
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We wrap each pipe with protective foam, then place it in a perforated metal sleeve before burying it between stones. This prevents cuts and abrasion from natural rock movement.
We raise or lower the route around the rock, or get the engineer's approval to drill a shallow pit through it. We assess the alternative on site and verify falls and pressure before work starts.