Hot and cold supply
PPR runs sized for sink, dishwasher and fridge-water connections

Hawalli
Kitchen first-fix in Nuqra involves running pipes under level floors between slab and ceiling. We position hot and cold supply, waste and vent lines before cabinet assembly or tiling begins. Every joint is tested under pressure before drywall seals the chase. This stage is critical because fixes after closure cost time and disruption.
Flats in Nuqra near Salmiya sit on thick concrete slabs with limited space between floor and soffit. We check the slab depth to see if pipes can hide beneath or if a new chase box is needed. Where space is tight we use thin-walled tube and low-profile fittings. Everything is tested with cold water then hot water before moving to the next stage.
Nuqra in Hawalli sits near Salmiya and is a high-rise flat area where routing space is strictly limited.
We pressure-test each line separately then all together before closing because fixing a leak afterwards means breaking the slab.
PPR runs sized for sink, dishwasher and fridge-water connections
uPVC drain at correct fall to stop grease settling inside the pipe
Grease trap position and vent stack stub to block sewer odour entry
Gas supply stub-out to cooker position run before wall cladding closes
Supply and drain stub prepared at the right height for the water heater
Recorded pressure test on all supply lines before any wall is closed
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We measure the gap between slab and soffit first. If less than 15 cm we build a timber or metal chase box on the floor and run pipes through it. The box cover goes on before tiling starts.
We run a larger-diameter pipe across the floor or wall towards the stack. The gradient must stay between 25 and 50 mm per metre throughout. If the distance is very long we propose a secondary vent riser.