Hot and cold supply
PPR runs sized for sink, dishwasher and fridge-water connections

Capital
Kitchen first-fix in Qibla starts when concrete is set and electrical is not yet coordinated. We run hot and cold feeds from the main riser and lay waste with steady fall toward the stack. We fix vent pipes from the roof and pressure-test everything before drywall begins.
Modern Qibla kitchens are deep and set back from structural columns, which means long supply runs from the central riser. We plot pipe routes between beams at the minimum height to preserve ceiling space. The waste needs at least one percent fall toward the vertical stack, requiring precise levels on concrete slabs. Vent pipes from sink and washing machine connect straight and pass through the roof at a true angle.
Qibla sits near Seif Palace and the Gulf shore, a wide commercial zone with tall buildings and modern flats.
Every supply line is tested at six bar pressure for one minute before any wall cavity closes.
PPR runs sized for sink, dishwasher and fridge-water connections
uPVC drain at correct fall to stop grease settling inside the pipe
Grease trap position and vent stack stub to block sewer odour entry
Gas supply stub-out to cooker position run before wall cladding closes
Supply and drain stub prepared at the right height for the water heater
Recorded pressure test on all supply lines before any wall is closed
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We bore beams before concrete pour if possible, otherwise we use a core drill after and sleeve the pipe in a metal guard. The hole does not weaken the beam if it is away from high stress zones.
The first constraint is the required waste fall, the second is finishing space above the pipe. We calculate fall from sink point to stack, then choose the lowest height that permits it.