Hot and cold supply
PPR runs sized for sink, dishwasher and fridge-water connections

Capital
Kitchen first fix in NW Sulaibikhat focuses on modern residential blocks needing even hot and cold distribution to multiple floors. We calculate pressure and flow, testing each line before handover.
New residential towers in NW Sulaibikhat need roof tanks and vertical stacks spanning tens of metres, and maintaining fall in horizontal runs on each floor is tough at that height. We insulate hot lines thickly because rise bleeds heat, and waste needs expert venting near sinks on each floor. We pressure-test the ground and top floors together to ensure even flow and fit strainers and isolating valves before any dry lining.
NW Sulaibikhat is a modern residential area where apartment towers and villas line the First Ring Road.
We pressure-test from ground and top floor simultaneously because pressure difference across floors can leave upper apartments with weak flow.
PPR runs sized for sink, dishwasher and fridge-water connections
uPVC drain at correct fall to stop grease settling inside the pipe
Grease trap position and vent stack stub to block sewer odour entry
Gas supply stub-out to cooker position run before wall cladding closes
Supply and drain stub prepared at the right height for the water heater
Recorded pressure test on all supply lines before any wall is closed
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
The roof tank alone gives slow pressure, so we fit booster pumps and intermediate tanks to ensure even flow everywhere. We size pipes so ground and tenth floor have no major pressure difference.
Long waste runs need venting every two or three floors to prevent vacuum and smells. We coordinate with structural engineers to route pipes through existing vent columns rather than opening new walls.
