Hot and cold supply
PPR runs sized for sink, dishwasher and fridge-water connections

Hawalli
Kitchen first-fix in South Surra begins with understanding the villa or flat layout before walls close. We run hot and cold supply from the nearest riser, route waste and vent pipe to the stack and test all joints under real pressure. This staging happens before tiles and cabinet boxes are set. Every connection is checked for leaks before drywall seals the space.
South Surra villas and flats have kitchens ranging from spacious to compact depending on plot size. In wider villas we have room to run pipework beneath floors and behind partition walls. We measure depth from slab to foundation to know how much clearance exists for waste routing. In smaller flats we choose the most direct run from sink to riser with the fewest bends.
South Surra in Hawalli is a mixed residential area of villas and flats where kitchen sizes vary widely.
We measure pipes and fittings three times before cutting because changes after closing mean breaking new walls.
PPR runs sized for sink, dishwasher and fridge-water connections
uPVC drain at correct fall to stop grease settling inside the pipe
Grease trap position and vent stack stub to block sewer odour entry
Gas supply stub-out to cooker position run before wall cladding closes
Supply and drain stub prepared at the right height for the water heater
Recorded pressure test on all supply lines before any wall is closed
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
The stack should sit behind the sink or beside the units, away from kitchen windows. In a narrow villa we run it straight up through the ceiling rather than a long horizontal route. We test ventilation clearance before closing.
Yes, if the main stack is nearby and you have room for a second branch line. We verify pipe diameter and fall for both sources. The bathroom entry point must sit lower than the kitchen outlet to ensure proper drainage.
