Plumbing and electrics first-fix
Coordinating pipe and conduit routes before walls are closed

Ahmadi
First-fix plumbing in Shuaiba Industrial starts before concrete is poured because the zone holds factories and warehouses that need heavy water and sewerage flows. We run supply and drain lines through a thick concrete base and fix galvanised steel and cast-iron pipes to handle high pressure. Every joint is welded or threaded tight and each line tested before enclosure.
Industrial facilities in Shuaiba have drainage loads different from houses: multi-storey toilets, labour kitchens, wash stations. We lay drain lines in larger diameters than standard and install roof vent pipes on every floor to release air from the tubes. Floor traps are sited away from heavy-load zones because differential settlement cracks pipes. We measure falls precisely on each section to ensure steady flow.
Shuaiba Industrial lies in Ahmadi governorate, an area of processing plants and treatment stations where drainage systems need extra depth and reinforcement.
Before pouring, every drain line is pressure-tested with water to verify no leak at any joint.
Coordinating pipe and conduit routes before walls are closed
Hot, cold and waste lines run to every sanitary point
Supply for sink, appliances and gas line inside the structure
Full pipe runs per unit including meter point positions
Drain lines laid to correct falls with proper vent stacks
Ground and roof tank connections integrated during structural stage
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
A factory drains dozens of toilets and sinks at once, and heavy flow needs a larger section to avoid bottleneck and overflow. We size the diameter by fixture count and operating hours.
In common drainage zones we prefer burial to protect pipes from damage and heat. But in narrow corridors we may run lines suspended from the ceiling on strong steel supports.
