Plumbing and electrics first-fix
Coordinating pipe and conduit routes before walls are closed

Hawalli
First-fix plumbing in South Surra begins with understanding the layout of modern villas with multiple bathrooms and gardens needing irrigation pipes. We run supply lines from the meter point and distribute them across floors with insulation for hot water. We connect wastes to the main stack in the villa courtyard with steady falls throughout.
Residential villas in South Surra near upscale neighbourhoods feature marble, fine tilework and deep foundations. We fix underground waste line positions before concrete pours, because locating them later costs more. We select pipe diameters based on number of bathrooms, toilets and kitchen, and coordinate with the villa owner on roof tank placement to set supply riser height correctly.
South Surra lies in Hawalli and is a district of upscale villas where the land slopes gently south, helping waste water drain naturally.
We test underground waste drainage by running 150 litres per minute for one hour before concrete pours because repairing it later weakens the foundation.
Coordinating pipe and conduit routes before walls are closed
Hot, cold and waste lines run to every sanitary point
Supply for sink, appliances and gas line inside the structure
Full pipe runs per unit including meter point positions
Drain lines laid to correct falls with proper vent stacks
Ground and roof tank connections integrated during structural stage
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, but we must recalculate the supply riser height and underground pit depth. Tank position sets water pressure, and changing it means retesting the whole system before wall closure.
Usually 30 to 45 centimetres below the finished concrete level, depending on soil type and groundwater. We measure on site first and keep pipes far enough from foundations so they don't weaken them.