First-fix plumbing in Wafra Agricultural starts with a full blueprint of supply and drain runs before the concrete foundation is poured. We lay cold, hot, grey and black water pipes in foundation trenches and secure them with metal clamps. Every joint gets air-pressure tested before backfill. No access later.
Farms and nurseries in Wafra need supply points spread across multiple locations due to plot size and scattered buildings. First-fix plumbing done right here means one main run from the pump inlet in redundant pipes under ground with isolation valves at each zone. Drainage is collected from different areas into one or more soakaway pits, so we size each pipe by the expected load from that section.
Wafra Agricultural lies in Ahmadi governorate and is known for vegetable farms and poultry facilities, requiring plumbing design that allows for future expansion.
All first-fix pipes are tested under air pressure at least three bar for thirty minutes before walls are sealed.
Coordinating pipe and conduit routes before walls are closed
Hot, cold and waste lines run to every sanitary point
Supply for sink, appliances and gas line inside the structure
Full pipe runs per unit including meter point positions
Drain lines laid to correct falls with proper vent stacks
Ground and roof tank connections integrated during structural stage
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Very difficult because main pipes are locked in foundations and walls. The first blueprint must include every anticipated point even if unused initially. We cap off ends for easy connection later.
We design a closed system collecting grey and black water in treatment tanks then distributing to soakaway pits dug at proper depth. Soil permeability is tested first to determine pit diameter and depth.