Bathroom plumbing
Supply and drain lines to all bathroom fixtures and outlets

Farwaniya
Plumbing in Ardhiya Warehouses serves staff areas and the warehouse itself with supply connecting the roof tank to toilets and offices. We draw the main pipe schematic with secondary branches, secure pipes to walls and ceilings with safe supports and test pressure and flow before handover.
Large warehouses in this area usually have open wide space with small offices in a corner or first floor, meaning pipes need long runs with no obstacles. The supply line rises from the roof tank and branches in several directions toward offices, toilets and industrial taps. Drainage must slope gently toward the sewers, and we often run separate waste from storage zones if they may contain light chemicals.
Ardhiya Warehouses in Farwaniya governorate store goods and materials, requiring plumbing that supports staff work and maintenance operations.
Before handover, every pipe line is filled with water and all taps and drains are opened to check pressure and flow at each point.
Supply and drain lines to all bathroom fixtures and outlets
Hot and cold supply lines and drain runs under the sink
Flexible PEX runs that handle Kuwait's high ambient temperatures well
Setting correct fall angles to prevent sediment buildup and early blockages
Isolation valves on every circuit so future repairs do not shut the whole building
Pressurising the network before plastering to catch any joint failure early
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Deep grooves can be cut in walls and pipes installed inside them, or they can run behind panels and air-con units. Metal pipes are protected with thermal insulation and joints are tested before sealing, with small access points left for future maintenance.
We cut a channel under the floor from the new point toward the nearest main line, sloped correctly. A floor trap with a strong metal cover that withstands the weight of goods and trolleys is installed, then flow is tested with full water.