Supply pipework
Hot and cold PPR lines run inside walls to each fixture

Farwaniya
Bathroom and kitchen plumbing in Ardhiya Industrial starts with understanding steel frames and thick concrete floors. We run supply and drain from staff facilities and canteens through foundations and pressure test before handover.
Factories and large sheds in Ardhiya Industrial near the Free Zone have multiple staff bathrooms and water points, each needing its own waste line with steady fall to one collection point. Thick concrete floors mean we plan routes before pour sometimes, or if already cast we cut narrow chases and bury pipes carefully to avoid concrete cracking. Every trap joint is checked because a factory with drain odour loses worker time.
Ardhiya Industrial in Farwaniya governorate is a factory and metalwork zone dominated by skeletal frames and deep concrete foundations.
After complete installation, each waste line is filled with water under pressure and we wait thirty minutes to check for any drop indicating a leak.
Hot and cold PPR lines run inside walls to each fixture
uPVC drain pipes set at correct fall to prevent sediment buildup
Dishwasher, sink and grease-trap connections run and tested
Individual valve per circuit so one fixture shuts off independently
Network pressurised before plastering to expose any weak joint
Toilets, basins and mixers connected after final finishes are complete
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Each bathroom has its own waste branch sloping steadily into a larger main trunk. We use swept bends at junctions to avoid air locks that trap water. Each branch flow is tested before sealing.
Narrow gradual chases and leaving steel reinforcement intact minimizes cracking, and most factories prefer planning before the concrete pour. We choose based on existing floor condition.