Central gas first-fix
Main gas network laid and pressure-tested before walls are plastered.

Farwaniya
Central gas line installation in Ardhiya Industrial starts by mapping distribution routes from the main meter to each production unit. We run copper pipework under floors and through walls, pressure-test each section before handover and check for leaks, fittings and combustible materials near the gas.
Ardhiya Industrial factories have multiple floors and roof tanks, with gas typically reaching boilers and furnaces in centralised plant rooms. We map the best pipe route to avoid heavy loads and tight spaces, selecting diameters that match daily consumption rates. At each unit inlet we install an isolation valve and fit a pressure gauge for ongoing leak detection.
Ardhiya Industrial lies in Farwaniya governorate, an area of factories and workshops with heavy natural gas demand.
Every line is pressure-tested at 10 bar for 30 minutes because factories cannot tolerate unplanned downtime.
Main gas network laid and pressure-tested before walls are plastered.
Residential kitchen gas points run to correct sizing and outlet count.
Commercial kitchen gas networks sized for high demand with isolation at each appliance.
Leak located with detection instruments before any wall or floor is opened.
Ball valves fitted at the main inlet and at every branch point.
Periodic check of all valves, joints and fittings across the gas network.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We use copper pipe rated for industrial environments and coat it with protective paint before installation. After fixing, we test the entire network to confirm moisture and condensation cannot enter.
We document every section with precise drawings showing pipe routes, diameters and valves. For expansion, we use the same standards and materials to connect new sections seamlessly to the original network.