Supply pipework
Hot and cold PPR lines run inside walls to each fixture

Ahmadi
Bathroom and kitchen plumbing in Fintas starts by mapping supply and waste runs before fixtures go in. We lay copper pipes for hot and cold water and slope all drains toward the sewer. Each line is tested under air pressure and walls are sealed before handover.
Beachside homes in Fintas sit far from main sewer lines, so we run long supply and waste runs with precise fall across gardens and foundations. Sandy ground needs pipe protection from movement and cracking, so we bed drains in ducts or plastic sleeves. Kitchens here often need a grease trap before the main waste because homes connect to private treatment tanks.
Fintas is a coastal area in Ahmadi governorate where villas and large homes require long isolated runs separate from the public grid.
Every waste pipe is tested at 1.5 bar air pressure for 15 minutes before being buried under sand.
Hot and cold PPR lines run inside walls to each fixture
uPVC drain pipes set at correct fall to prevent sediment buildup
Dishwasher, sink and grease-trap connections run and tested
Individual valve per circuit so one fixture shuts off independently
Network pressurised before plastering to expose any weak joint
Toilets, basins and mixers connected after final finishes are complete
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes. Runs longer than 20 metres need an air valve at the high end and at the midpoint to stop air locking and slow drainage. We test flow after installation to confirm there are no blockages.
Hot pipes go into insulation sleeves then into protective ducts. Cold pipes we bury deeper and check foundations for summer cracks before laying. All this is documented in the final report.