Supply pipework
Hot and cold PPR lines run inside walls to each fixture

Ahmadi
Bathroom and kitchen plumbing installation in Jaber Al-Ali starts by mapping pipe routes from the roof tank and main drain point through the villa walls. We lay copper supply and PVC waste lines under floors or on walls depending on existing construction. Every joint is pressure and water-tested before final sealing.
Jaber Al-Ali villas are usually newer build with open-plan kitchens flowing into living areas and a master bathroom on the ground floor. Waste from kitchen and bathroom discharges into shared pipes under the street near Jaber Al-Ali Co-op, so we measure distance and height carefully because any rising in the waste line causes traps. We use 75 mm pipes for bathrooms and 100 mm for kitchens to ensure fast flow and easy maintenance later.
Jaber Al-Ali is in Ahmadi governorate, a modern suburban zone close to shopping and public service centres.
We measure drain slope using a level and water during installation because wrong slope causes blockages that are hard to clear later.
Hot and cold PPR lines run inside walls to each fixture
uPVC drain pipes set at correct fall to prevent sediment buildup
Dishwasher, sink and grease-trap connections run and tested
Individual valve per circuit so one fixture shuts off independently
Network pressurised before plastering to expose any weak joint
Toilets, basins and mixers connected after final finishes are complete
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We run a 100 mm waste pipe vertically inside the wall to ground level, then horizontally under the foundations toward the main entry point. The slope on the horizontal pipe must be at least 1 cm per metre.
Yes, if there is a gas line or heater below it. We wrap copper pipes in thermal foam and keep at least 15 cm clearance from any heat source.
