Supply pipework
Hot and cold PPR lines run inside walls to each fixture

Farwaniya
Toilets in Khitan family homes near Khitan Co-op usually have a shattaf beside them, and bathroom and kitchen plumbing here often includes feeding that hand sprayer with warm water. Roof tank water is hot in summer and cold in winter, so a small mixer valve lets the family set a comfortable temperature all year.
Adding warm water to a shattaf means bringing a hot line to the toilet wall, which is often missing in older Khitan bathrooms. We chase a short hot feed from the basin supply, fit a concealed or wall mixer with a single outlet for the sprayer, and place it where it can be reached from the seat. A check valve on each side stops hot and cold water crossing through the sprayer when its trigger is closed.
Khitan is a densely built Farwaniya governorate district near Farwaniya Hospital, served by Khitan Co-op, with many family homes.
Shattaf mixers we fit in Khitan have a check valve on both hot and cold feeds.
Hot and cold PPR lines run inside walls to each fixture
uPVC drain pipes set at correct fall to prevent sediment buildup
Dishwasher, sink and grease-trap connections run and tested
Individual valve per circuit so one fixture shuts off independently
Network pressurised before plastering to expose any weak joint
Toilets, basins and mixers connected after final finishes are complete
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes. We bring a short hot feed to the toilet wall and fit a small mixer so you can set the temperature.
When the sprayer trigger is closed, hot and cold can push into each other. Check valves stop that crossflow.
