Supply pipework
Hot and cold PPR lines run inside walls to each fixture

Capital
Bathroom and kitchen plumbing in Mansouriya focuses on dense apartment blocks and stacked floors. We route pipes within narrow walls and fit outlets in tightly fixed spots. Each unit must pass independent pressure and drainage tests. Working tight in confined space is essential to avoid costly engineering changes.
Mansouriya has many residential buildings with small bathrooms and kitchens open to living areas. Pipes in these units run inside walls shared between flats, so we maintain clearance from adjacent walls. Drains must slope steadily toward central vertical stacks. We fix water pipes with flexible mounts to reduce noise when taps are shut off.
Mansouriya sits near Fourth Ring Road in Kuwait City, a district of mid-rise buildings with high residential density.
Each flat is pressurized for at least thirty minutes because shared walls raise the risk of silent leaks.
Hot and cold PPR lines run inside walls to each fixture
uPVC drain pipes set at correct fall to prevent sediment buildup
Dishwasher, sink and grease-trap connections run and tested
Individual valve per circuit so one fixture shuts off independently
Network pressurised before plastering to expose any weak joint
Toilets, basins and mixers connected after final finishes are complete
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Sometimes we raise the waste line above the false ceiling to pass over the wall, then drop it to the main stack elsewhere. This needs engineer approval and a steady fall of at least one centimetre per metre.
We fit vent terminals on the stack top and check valves on each waste line. Proper venting of the main stack through the roof roof prevents odours and gases from backflowing.