Supply pipework
Hot and cold PPR lines run inside walls to each fixture

Farwaniya
Bathroom and kitchen plumbing in Shadadiya requires careful planning because villas are spread apart and tanks may be remote. We run correctly sized pipes and pressure-test every section before handover.
Shadadiya villas are large with spacious ground plans, meaning long distances between tank and outlets especially in remote kitchens and bathrooms. We size pipes carefully because long runs cause pressure drop easily if diameter is wrong. We lay pipes underground in the first section, then rise in walls to outlets, checking every bend for adequate support to prevent vibration and noise.
Shadadiya is in Farwaniya governorate on the outer edges, a district of spacious villas set far apart.
We test pressure at the furthest outlet after full rough-in to confirm it does not drop below 2 bar.
Hot and cold PPR lines run inside walls to each fixture
uPVC drain pipes set at correct fall to prevent sediment buildup
Dishwasher, sink and grease-trap connections run and tested
Individual valve per circuit so one fixture shuts off independently
Network pressurised before plastering to expose any weak joint
Toilets, basins and mixers connected after final finishes are complete
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We protect underground pipes by placing them in rigid plastic ducts or under a sand bed below tiles. We avoid running pipes under heavy traffic areas and garages.
We run the test for at least one hour at 6 bar for each system section. If total run length exceeds 30 metres we may extend to 90 minutes to ensure pressure stabilizes completely.
