Supply pipework
Hot and cold PPR lines run inside walls to each fixture

Jahra
In Sulaibiya Agricultural, bathroom and kitchen plumbing needs special planning because rural houses differ from urban homes. We measure from the roof tank and high ceilings, run pipes with strong supports and test everything thoroughly.
Most agricultural houses in Sulaibiya have a roof tank with kitchen and bathroom far apart. Supply runs drop from high up for long distances, so we select pipe diameters to hold pressure at every outlet. Waste needs steady fall the whole way from sink to floor trap in the garden.
Sulaibiya Agricultural is in Jahra governorate and contains family farms with separate rural houses spread across open land.
Long supply runs from roof tank lose pressure, so we clean filters and carefully select pipe sizes before the pressure test.
Hot and cold PPR lines run inside walls to each fixture
uPVC drain pipes set at correct fall to prevent sediment buildup
Dishwasher, sink and grease-trap connections run and tested
Individual valve per circuit so one fixture shuts off independently
Network pressurised before plastering to expose any weak joint
Toilets, basins and mixers connected after final finishes are complete
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We choose a larger pipe diameter in the first section of the run to reduce pressure loss, then check pressure at each outlet with a pressure gauge.
We use rigid plastic pipes with consistent fall, bury them deep enough to avoid frost and test with full discharge before backfilling.
