Bathroom plumbing
Supply and drain lines to all bathroom fixtures and outlets

Hawalli
Supply and drain runs in Hawalli serve apartments and mixed commercial buildings at high density. We run pipes vertically through structural columns and distribute horizontally within raised floors. Each section is pressure-tested before walls and ceilings close.
Most Hawalli buildings are residential towers of 4 to 8 storeys with many partitions and multiple kitchens and bathrooms per unit. Pipe runs start from the roof tank above the central stairwell, then branch horizontally on each floor. Raised floors provide space for supply and waste runs side by side. We test supply pressure at each storey because upper floors may need a booster pump if pressure drops.
Hawalli in Hawalli governorate is a dense commercial and residential district of medium-rise towers and shops near Hawalli Co-op.
Every horizontal waste pipe is tested with a minimum fall of 1 cm per metre length to prevent water pooling.
Supply and drain lines to all bathroom fixtures and outlets
Hot and cold supply lines and drain runs under the sink
Flexible PEX runs that handle Kuwait's high ambient temperatures well
Setting correct fall angles to prevent sediment buildup and early blockages
Isolation valves on every circuit so future repairs do not shut the whole building
Pressurising the network before plastering to catch any joint failure early
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Raised floors provide ideal runs. We lay supply and waste pipes under the original floor before installing the new base. Each pipe is clamped with metal brackets and left accessible for insulation. Pipes under the floor are tested before the void is sealed.
We measure pressure with a gauge on each floor. If it falls below requirement we recommend a pressure pump in the plant room or near the roof tank. The pump raises pressure to all upper units. It is tested under full load before handover.