Bathroom plumbing
Supply and drain lines to all bathroom fixtures and outlets

Jahra
Plumbing installations in Jahra Industrial serve workshops and factories needing high-pressure water supply and robust drainage. We install heavy-duty metal pipes from the main pump centre with isolated drain networks and multiple treatment stations, testing each section at elevated test pressure.
Jahra Industrial buildings house engineering workshops, wash bays and storage areas. Main supply lines extend from the central pump station across raised floors and external walls. Isolation valves are fitted in each section to cut off any zone for maintenance. Drainage carries water and solids from each work area to a primary settling basin then secondary treatment unit.
Jahra Industrial is located in Jahra governorate and houses manufacturing facilities and light engineering equipment zones.
Supply pipes are tested at one and half times maximum working pressure for thirty minutes with no measurable drop.
Supply and drain lines to all bathroom fixtures and outlets
Hot and cold supply lines and drain runs under the sink
Flexible PEX runs that handle Kuwait's high ambient temperatures well
Setting correct fall angles to prevent sediment buildup and early blockages
Isolation valves on every circuit so future repairs do not shut the whole building
Pressurising the network before plastering to catch any joint failure early
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We select stainless steel or coated copper pipes depending on water type and use. Inlet strainers are fitted at the pump station to remove fine sediment. Pipe samples are tested after time to check corrosion rate.
Yes if we focus on the floor and outside production zones. We install the new drain line parallel to the existing one then connect at a separate management point. On completion flow is diverted without stopping machinery.