PEX pipe runs
Flexible concealed runs with the fewest cuts into finished walls

Hawalli
Flexible PEX plumbing in the Ministries Area provides reliable supply for multi-storey government buildings. We run PEX pipe from the main meter through foundations and walls to every fixture point. Each branch is pressure-tested before handover. Work is complete before plaster and paint begin.
Large administrative buildings near the Government Ministries Complex need even water distribution across dozens of staff offices and service floors. PEX tolerates long runs and sharp bends imposed by corridor layouts and concrete columns. We install isolation valves at each floor to allow future maintenance without shutting down the whole network. Flexible pipe gives us the routing freedom needed around the many structural obstacles in sprawling government buildings.
The Ministries Area in Hawalli governorate concentrates government buildings, meaning PEX systems must withstand heavy daily use and extended operating hours.
We test the PEX network at 6 bar for at least one hour before building handover because pipes buried under sand need every joint verified for tightness.
Flexible concealed runs with the fewest cuts into finished walls
Brass press fittings that need no flame or solvent cement
Run before walls close to confirm every joint is sound
One valve per circuit so any line can be shut independently
Set to prevent sludge build-up and recurring blockages
Tying the PEX network to every use point across the building
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
In exterior walls and areas with direct sunlight we use metal sleeves or protective conduit because UV rays weaken PEX. Inside shaded interior walls they are not needed.
We install at least one isolation valve at each floor entry point and at each fixture group. This allows repair of one floor without cutting water to the other storeys.