Supply pipework
Hot and cold PPR lines run inside walls to each fixture

Hawalli
Bathroom and kitchen plumbing in the Ministries Area starts with a full site survey and available height checks. We run cold, hot and waste lines from the entry point to each final outlet. Every joint is tested under pressure before handover. The work demands precision in calculations and correct falls.
Government ministry and institutional buildings in this area hold numerous bathrooms, kitchens and staff facilities running in parallel. This means supply lines must use larger pipe diameters to prevent pressure drop when several outlets run together. We plot all runs on drawings first and mark support and fixing points. Waste pipes need steady fall along their full length to the main stack near the ministries complex.
The Ministries Area lies in Hawalli and houses large official government buildings, where plumbing must handle high water loads throughout working hours.
Each water line is tested at steady pressure for thirty minutes before pipes are concealed within walls and floors.
Hot and cold PPR lines run inside walls to each fixture
uPVC drain pipes set at correct fall to prevent sediment buildup
Dishwasher, sink and grease-trap connections run and tested
Individual valve per circuit so one fixture shuts off independently
Network pressurised before plastering to expose any weak joint
Toilets, basins and mixers connected after final finishes are complete
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We use larger pipe diameters on main lines based on the number of outlets expected. We calculate the required flow per floor and choose the diameter that maintains even pressure.
Waste descends through central vertical stacks inside building walls or beside structural columns. We avoid routes near office furniture and ensure easy access for cleaning at inspection points.
