PEX pipe runs
Flexible concealed runs with the fewest cuts into finished walls

Hawalli
PEX plumbing in the dense Siddiq district requires careful planning to avoid clashing with existing cables and drains. We run the network from the main supply point through lower and upper floors along pre-marked routes. We test each section separately then join sections together under continuous pressure monitoring.
Houses in Siddiq near Siddiq Co-op sit close together, with ceilings packed with drainage runs and electrical cables. We sometimes use a basic camera to trace old pipes before drilling walls. When we find safe space we lay PEX carefully, and liaise with an electrician if the gap is too tight.
The Siddiq district sits in Hawalli governorate, an older residential quarter with densely packed adjoining houses.
Before starting to drill we scan walls with a small metal detector to avoid cutting hidden electrical cables or unknown buried pipes.
Flexible concealed runs with the fewest cuts into finished walls
Brass press fittings that need no flame or solvent cement
Run before walls close to confirm every joint is sound
One valve per circuit so any line can be shut independently
Set to prevent sludge build-up and recurring blockages
Tying the PEX network to every use point across the building
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
No, we keep at least 5 centimetres clear to reduce heat transfer and vibration. If space is very tight we place a thin plastic shield between the pipes.
It is best to know where main cables are beforehand. If uncertain, we call an electrician to quickly identify hazardous routes before we drill any wall.
