PEX pipe runs
Flexible concealed runs with the fewest cuts into finished walls

Hawalli
PEX plumbing in Zahraa suits the horizontal branches connecting to the shared vertical stack in three to six floor blocks, since the pipe's flexibility lets it thread through existing narrow channels without demolishing an entire shared wall in this Hawalli district.
Zahraa's mid-rise blocks connect each floor's flat to the shared vertical stack through a short horizontal branch, and when this branch is damaged in one flat, PEX is preferred because it threads through the short available distance inside the wall without needing to dismantle parts of the shared stack serving other floors. We enter through a limited access point at the branch-to-stack connection, replace the damaged branch with flexible PEX following the existing route, and reconnect to the stack without cutting service to other flats in the same building.
Zahraa in Hawalli governorate is a district of mid-rise blocks, three to six floors, sharing vertical stacks served by short horizontal branches.
Replacing a damaged horizontal branch with PEX in Zahraa does not cut service to other flats on the same shared stack.
Flexible concealed runs with the fewest cuts into finished walls
Brass press fittings that need no flame or solvent cement
Run before walls close to confirm every joint is sound
One valve per circuit so any line can be shut independently
Set to prevent sludge build-up and recurring blockages
Tying the PEX network to every use point across the building
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
No, PEX allows replacing just your flat's horizontal branch at its connection to the shared stack, without cutting service to other floors.
Because it threads flexibly through the short distance available inside the shared wall, without needing to dismantle parts of the vertical stack serving other floors.
