Supply line checks
Pressure readings and joint checks to catch early leaks before damage spreads

Jahra
Building networks in Jahra Industrial require intensive monitoring because massive factories consume huge water volumes for production and cooling with heavy chemical-laden discharge. We inspect supply and vertical lines and verify pipe resistance to chemicals and trap capacity to retain.
Jahra Industrial factories include waste incinerators and cement and chemical plants discharging acidic, alkaline and very hot water. Standard PVC pipes dissolve under high temperatures so we use heat-resistant PVC-U or polyvinyl chloride pipe. We check pipe thickness, drain fall and condition of double traps that retain water and protect against odour and backflow.
Jahra Industrial in Jahra governorate clusters heavy factories and complex chemical processes with demanding drainage networks.
Pipe chemical resistance is tested by drawing samples and immersing test coupons of the pipe material used.
Pressure readings and joint checks to catch early leaks before damage spreads
Inspecting building drains and noting any slowdown or sediment before full blockage
Checking transfer and pressure pumps and all tanks at every scheduled visit
Camera and acoustic tools locate hidden leaks without breaking tiles on a guess
Checking and repairing mixers, taps and cisterns across the building units
Recording each visit's findings and repair recommendations for the building owner
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
High concentrations of acid and alkali dissolve standard PVC quickly causing leaks in weeks. Chemical-resistant plastic like PVDF must be used to withstand prolonged exposure, and every pipe batch is tested with a sample of actual discharge before installation.
A single trap may dry or block quickly allowing foul gas and bacteria backflow from the main sewer. A double trap ensures at least one stays sealed retaining minimum water to prevent backflow even if the other fails temporarily.
