Horizontal drain runs
uPVC pipes graded to correct fall for each wet room and kitchen

Jahra
Drainage-first in Jahra Industrial begins with a precise survey of each factory and expected flow loads. We run waste lines from production areas and toilet blocks at steady slope toward central treatment. Collection traps and vent pipes install before concrete pour and roofing. Cold and hot water testing confirms the whole system works.
Jahra Industrial factories are varied: some light manufacture, others handling heavy or acidic fluids. Each production type needs its own trap and may need pre-treatment before the main line. We install separator and settling chambers before final discharge, especially when water carries oils or solids.
Jahra Industrial lies in Jahra governorate, a multi-factory zone requiring specialized drainage systems matched to each production type.
We sample drain water from each factory before design to confirm pipes and tanks can withstand acidity or chemical concentration.
uPVC pipes graded to correct fall for each wet room and kitchen
vent column fitted to prevent trap siphoning and sewer odour indoors
cleanout positions fixed before burial so future maintenance needs no breaking
floor traps set at correct level before screed is poured over them
building drain lines connected to the external sewer at correct invert level
all drain lines water-tested before burial to confirm joints are sound
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We install a separator or chemical treatment tank on-site before the main line. This neutralizes acidity and removes oils so water is safe for standard pipes.
Not always. If factories are close and produce the same water type one tank can be shared. We size it based on total daily flow rate.
