Supply line checks
Pressure readings and joint checks to catch early leaks before damage spreads

Plumbing maintenance contracts
Documented periodic checks of a complex's supply lines, drainage, pumps and tanks, with camera and acoustic tools catching faults before damp stains or tile damage appear
Regular follow-up on every part of a building's plumbing from supply source to drain outlet
Pressure readings and joint checks to catch early leaks before damage spreads
Inspecting building drains and noting any slowdown or sediment before full blockage
Checking transfer and pressure pumps and all tanks at every scheduled visit
Camera and acoustic tools locate hidden leaks without breaking tiles on a guess
Checking and repairing mixers, taps and cisterns across the building units
Recording each visit's findings and repair recommendations for the building owner
Call or WhatsApp us with the building type and unit count
Team visits to assess pipes, pumps and tanks before any contract is agreed
Coverage scope and visit frequency are set based on the survey findings
Each visit covers inspection, pressure checks and documentation with immediate fault alerts
Written report delivered after each visit with recommendations for the next round
Films pipe walls from inside to show scale buildup or cracks before they worsen, results viewed live by the owner
Picks up water movement through walls or tiles to pinpoint a break without any guesswork demolition
Pressure measured at key network points to distinguish a pump fault from a scaled or narrowed pipe
Used for section replacements because it resists Kuwait's heat and the scale that corrodes galvanised iron from inside
Tell us the number of units, floors and building age so visit frequency and scope can be quoted accurately
If the building has old galvanised iron pipes, mention it first as it changes the inspection approach entirely
Previous leaks, damp patches or pressure complaints help focus the first inspection visit on the right areas
Confirm that keys to pump rooms, tank hatches and meter chambers are available on the day of the visit

Part of Plumbing maintenance contracts · All services · Back to the home page
No fixed price list applies because these factors together shape what the contract costs
A ten-unit building differs greatly in scope from a hundred-unit complex
Older networks with galvanised iron require more time per inspection visit
The agreed number of periodic visits directly affects the annual contract value
Commercial or restaurant use loads the network harder than residential and requires wider coverage
Whether parts and emergency call-outs are included changes the overall contract price
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else’s home is not ours to be careless in.
Do not take our word for it. Look at the work yourself.
The leak is marked before a single tile comes up.
A leak does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Six governorates, 139 areas.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, the contract can be structured to cover residential and commercial floors together, with a clear scope defined for each part of the building.
A failing transfer or pressure pump shows up as weak pressure in the units, which owners often misread as a pipe fault. Periodic checks separate the two causes before damage or disruption occurs.
A maintenance visit follows a set checklist and finds problems before they surface. Emergency response deals with what has already failed and usually after some damage has occurred.
Yes, the visit includes a water meter reading with all taps closed and acoustic checks at suspect walls to catch any hidden leak, without breaking tiles unless the location is confirmed.
Kuwait's hard water deposits scale inside pipe walls, mixer valves and meters. This gradual narrowing raises stress on pumps and speeds up corrosion in any remaining galvanised iron sections.
