Position and height
Basin set at a practical height and checked level before any connection is made.

Capital
An ablution basin installation in Dasman typically begins when a family requests a separate washing point in the hallway or passage near the majlis. We measure the distance to the nearest floor trap, run supply lines from the main distribution, connect the waste with consistent fall and test every joint before completion.
Dasman villas often have long hallways and expensive marble or tile flooring under foot level. A wall-hung basin is the common choice here because it keeps the floor pristine and avoids cutting a deep waste channel under fine decoration. We run the taps and outlets under full flow to ensure not a single drop leaks onto the precious floor.
Dasman lies on the Arabian Gulf coast in Kuwait city, a high-end villa district where residents typically place guest bathrooms adjacent to formal majlis areas.
Before handover, every tap is opened to full pressure for one minute to flush any light scale from the new supply lines.
Basin set at a practical height and checked level before any connection is made.
Trap and rubber seal fitted so waste drains fully with no odour return.
Braided flexible tails connected to isolation valves for future servicing.
Single-lever or separate taps set with PTFE tape and thread compound at every joint.
Non-fungal sanitary silicone applied along the full basin perimeter to keep moisture out.
Flow confirmed and every joint inspected for drips before the technician leaves.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, a wall-hung basin needs only vertical drilled holes for the bracket and fasteners. The waste pipe runs horizontally up the wall or ceiling until it reaches the nearest trap, preserving the floor tiles completely.
We route the waste pipe along the interior wall or under the ceiling with a minimum fall of one in one hundred. If cutting the wall is unavoidable, we use PVC pipes in hidden channels to carry wastewater to the main trap without pressure loss.
