Drain and supply check
Outlet position and height confirmed before the unit is placed

Capital
Bathtub installation in Dasman starts with measuring the bathroom and locating the drain outlet near an external wall. We level the base precisely, connect the waste pipe with steady fall and seal every joint with moisture-resistant silicone.
In Dasman flats near the Gulf, high humidity and salt winds attack metals and silicone seals. We inspect the tub base to confirm it sits on solid concrete beneath, not just tile, because weak floors crack the sealant. Seaward-facing windows increase ventilation, so we test the drain by running cold then hot water in sequence to check condensation does not creep back into the wall.
Dasman sits on Kuwait's seafront in the Capital governorate, where coastal humidity affects every metal fitting and silicone seal in bathroom installations.
We run a continuous water pressure test for two minutes before handover because slow leaks only show days later under coastal dampness.
Outlet position and height confirmed before the unit is placed
Bath feet adjusted until all four sides read level
Waste and overflow set fitted with a proper sealed gasket
Hot and cold lines connected with isolation valves and braided hoses
Non-fungal sanitary silicone along the full bath-to-tile joint
Unit filled and drained to verify every joint before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Tile alone is not enough in Dasman because humidity creeps beneath it. We lay a concrete or treated-wood base at least 5 cm high under the tub to carry weight and resist moisture.
Only if the wall is external and thick enough to house the pipe with steady fall and no sharp bends. We inspect the route first and test drainage before closing the wall to ensure no blockage risk.
