Position and height
Basin set at a practical height and checked level before any connection is made.

Ahmadi
Ablution basin installation in Fahad Al-Ahmad starts with measuring the ground-floor guest bathroom and locating the existing floor trap. We set the basin at a height comfortable for ablution, run hot and cold supply from nearby distribution points, and connect waste with a steady fall. We test flow and seals before handover.
Family homes in Fahad Al-Ahmad have separate guest bathrooms beside the formal majlis, most built with traditional layouts and basic floor traps. This means waste runs are short and fall is usually available, but trap depth varies house to house. We measure distance and height first to decide whether a wall-hung or corner basin suits the space. Where fall is tight we use narrow pipework and gradual bends to maintain flow.
Fahad Al-Ahmad lies in Ahmadi governorate, an established residential suburb where family houses are the norm and ground-floor guest bathrooms are standard in every home.
The waste line is run under steady flow for one minute before site closure to confirm water does not back up.
Basin set at a practical height and checked level before any connection is made.
Trap and rubber seal fitted so waste drains fully with no odour return.
Braided flexible tails connected to isolation valves for future servicing.
Single-lever or separate taps set with PTFE tape and thread compound at every joint.
Non-fungal sanitary silicone applied along the full basin perimeter to keep moisture out.
Flow confirmed and every joint inspected for drips before the technician leaves.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, but that means digging deeper to reach the main drainage line under the foundation. We usually prefer designing a waste line that works with the existing trap to avoid extensive excavation.
Yes if we anchor it to solid blocking in the masonry or beam. We check wall strength first and use corrosion-resistant anchor bolts throughout.
