Drain and supply check
Outlet position and height confirmed before the unit is placed

Ahmadi
Bathtub installation in Fahad Al-Ahmad begins with checking the drain outlet and confirming the waste line falls toward the main stack. We set the tub perfectly level, connect drainage and overflow, then run a water test before handover.
Most Fahad Al-Ahmad villas have modern bathrooms on the ground or first floor with glazed ceramic tub floors. We check the bathroom floor slope before positioning, because a level tub on a sloping floor leaves water pooling at one side and sitting in the drain. We wedge the tub base so water drains evenly from every point of the rim toward the central outlet.
Fahad Al-Ahmad sits in Ahmadi governorate, a villa district where fitted bathtubs in main bathrooms are the expected standard.
Before handover we fill the tub completely, then open the drain to confirm water flows from the outlet with no leaks at joints or seals.
Outlet position and height confirmed before the unit is placed
Bath feet adjusted until all four sides read level
Waste and overflow set fitted with a proper sealed gasket
Hot and cold lines connected with isolation valves and braided hoses
Non-fungal sanitary silicone along the full bath-to-tile joint
Unit filled and drained to verify every joint before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We place an anti-slip pad under each of the four tub feet before fastening. This grip holds the tub firmly in place even on a wet floor.
We inspect only the rubber seals and exposed metals when leaks appear. Under normal conditions there is no scheduled maintenance after the initial handover.
