Waste outlet check
Height and position confirmed before the shower tray is set.

Ahmadi
Shower installation in Fahad Al-Ahmad starts by mapping the vertical supply runs in the family house walls. We test water pressure, position the outlet according to floor falls, then connect the waste to the floor trap. We seal all gaps around the tray and run full flow before handing over.
Most villas in Fahad Al-Ahmad have spacious main bathrooms with floor slopes toward one corner, which makes safe shower placement easier. We measure the slope from every direction because level floors or reverse slopes need a raised tray or waste rerouting. Near Fahad Al-Ahmad Co-op, many villas have ceiling-level drainage nearby, so we choose a side-outlet tray instead of bottom discharge.
Fahad Al-Ahmad sits in Ahmadi governorate, a modern residential suburb of large family villas with bathrooms fitted with dedicated vertical supply runs.
Every shower is tested under running water for a full ten minutes to check for leaks at every joint and corner.
Height and position confirmed before the shower tray is set.
Tray levelled and trap sealed with a rubber gasket.
Hot and cold lines connected to the mixer with isolation valves.
Mixer and arm fitted with thread sealant on every joint.
All tray-to-wall edges sealed with non-fungal sanitary silicone.
Water run and full drainage confirmed before handover.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, we position the shower tray at the lowest floor point so water flows easily to the outlet. If the floor is level we raise the tray slightly to create a slope that ensures complete drainage.
Complete installation from measurement to final testing usually takes a full half-day. If the waste needs a new path under tiles the work may extend to a full day because of drying time.
