Position and height
Basin set at a practical height and checked level before any connection is made.

Farwaniya
Weak water pressure on the upper floors near Farwaniya Hospital changes how we approach an ablution basin installation in Farwaniya. We check the flow at the chosen point first, then pick a mixer and supply layout that deliver a usable stream even when the roof tank is low.
Many apartment blocks in Farwaniya feed each flat from a roof tank by gravity, so the top floors get little head and the flow drops further when neighbours draw water. A standard aerated mixer can reduce that trickle even more. We measure the flow at the new basin position, choose a low-pressure mixer where needed and keep the supply branch short with few bends, so the pressure the building has is not lost to friction.
Farwaniya, around Farwaniya Hospital and the Third Ring Road, is a dense district of apartment blocks fed from roof tanks.
On gravity-fed flats, a short supply branch with few bends preserves more of the available pressure at the tap.
Basin set at a practical height and checked level before any connection is made.
Trap and rubber seal fitted so waste drains fully with no odour return.
Braided flexible tails connected to isolation valves for future servicing.
Single-lever or separate taps set with PTFE tape and thread compound at every joint.
Non-fungal sanitary silicone applied along the full basin perimeter to keep moisture out.
Flow confirmed and every joint inspected for drips before the technician leaves.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
In gravity-fed buildings, the height between the roof tank and your tap sets the pressure. Upper floors have less height, so their flow is naturally lower.
Sometimes. If the measured flow is too low for comfortable use we can discuss a small booster for the flat, but a low-pressure mixer often solves it first.
