Position and height
Basin set at a practical height and checked level before any connection is made.

Farwaniya
An ablution basin installation in Khitan Al-Jadida begins by examining the drain location in the ground-floor bathroom. We choose the basin height, run cold and hot supply lines, connect the waste to the floor trap and test full flow before finishing.
Most Khitan Al-Jadida houses are family villas with a spacious ground-floor bathroom near the main entrance, meaning the new waste line is short and the fall is stable. We inspect the depth of the existing floor trap and measure the height from its bottom to the planned basin position. If the trap is shallow we choose a wall-hung basin with a higher outlet to ensure water flows without pooling.
Khitan Al-Jadida lies in Farwaniya governorate, a modern villa area with ready ground drainage in most bathrooms.
We test all waste and supply joints under full pressure to confirm no leaks at any connection before retiling.
Basin set at a practical height and checked level before any connection is made.
Trap and rubber seal fitted so waste drains fully with no odour return.
Braided flexible tails connected to isolation valves for future servicing.
Single-lever or separate taps set with PTFE tape and thread compound at every joint.
Non-fungal sanitary silicone applied along the full basin perimeter to keep moisture out.
Flow confirmed and every joint inspected for drips before the technician leaves.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Rarely, because Khitan Al-Jadida homes have purposeful drainage from the start. We measure the existing fall first, and if it is enough we run the waste pipe directly without raising the floor.
A wall-hung basin needs a higher outlet and frees up floor space. A floor-standing basin is simpler to connect if the trap is close and deep enough for the required fall.
