Drain and supply check
Outlet position and height confirmed before the unit is placed

Farwaniya
Bathtub installation in Abbasiya requires first measuring the available bathroom space and verifying the drain outlet height. We secure the tub firmly, seal all gaps, fill it with water and monitor for any leakage over a full hour.
Abbasiya residential buildings have small units with old tubs or showers only, and bathroom floors are usually raised slightly above corridor level. When adding a tub we measure distances from walls, doorway and window, because tight space rules out large tubs. We choose a unit sized to fit through the door and clean the old drain of deposits before connecting it to the new tub outlet with calibrated pipes and a flexible joint.
Abbasiya sits in Farwaniya governorate as a modern apartment district with compact units designed for efficiency.
We test the drain by emptying sixty litres at once and checking that no water pools on the bathroom floor.
Outlet position and height confirmed before the unit is placed
Bath feet adjusted until all four sides read level
Waste and overflow set fitted with a proper sealed gasket
Hot and cold lines connected with isolation valves and braided hoses
Non-fungal sanitary silicone along the full bath-to-tile joint
Unit filled and drained to verify every joint before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
It depends on door and space measurements. We visit first and measure the entrance and bathroom, then recommend a size that enters easily and leaves clearance to move in front of the toilet and basin.
Usually one day for prep and tiling, but the tile needs two days before bathroom use. We leave the door open for ventilation and clean excess grout before it dries.
