Drain and supply check
Outlet position and height confirmed before the unit is placed

Farwaniya
In Abdullah Mubarak, bathtub installation starts by measuring the distance from the bathroom to the main drain line underground. We position the tub precisely, seal all joints and run a final pressure test to confirm the seal.
Most Abdullah Mubarak homes date from the 1970s and 1980s, with old narrow drain pipes under concrete floors. When installing a new bathtub we inspect the old line carefully and run a new pipe beside it if needed. The concrete base needs packing and tight sealing to stop water seeping below the floor.
Abdullah Mubarak sits in Farwaniya governorate near Abdullah Mubarak Co-op and the Sixth Ring Road.
Old pipes are visually inspected first because some may hold deposits or partial blockages that affect drainage.
Outlet position and height confirmed before the unit is placed
Bath feet adjusted until all four sides read level
Waste and overflow set fitted with a proper sealed gasket
Hot and cold lines connected with isolation valves and braided hoses
Non-fungal sanitary silicone along the full bath-to-tile joint
Unit filled and drained to verify every joint before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We measure the bathroom first and locate the drain. For tight spaces we select a smaller tub or corner model to save room.
Yes, we place mixed cement packing under the tub base to ensure full stability and prevent movement during use. Then we recheck the level once more.
