Drain and supply check
Outlet position and height confirmed before the unit is placed

Ahmadi
Bathtub installation in Ahmadi starts with checking the drain outlet and levelling the alcove to stop water pooling. We set the tub on a flat base, connect the waste to the trap, run silicone around the rim and test the water under full pressure.
Most Ahmadi homes have bathrooms with modern tile panels and solid concrete floors. Bathtubs in these spaces need the slope under the floor checked because waste must flow cleanly to the trap, and any unevenness at the base causes pooling around the lower rim. We raise the tub slightly on metal brackets if needed to hold a steady drain fall, then seal every joint with structural silicone.
Ahmadi lies in Ahmadi governorate with uniform residential blocks where standardised building codes mean most bathtubs follow the same typical layout.
After fitting we fill the tub to the rim for a full minute and check every under-floor joint for any seepage.
Outlet position and height confirmed before the unit is placed
Bath feet adjusted until all four sides read level
Waste and overflow set fitted with a proper sealed gasket
Hot and cold lines connected with isolation valves and braided hoses
Non-fungal sanitary silicone along the full bath-to-tile joint
Unit filled and drained to verify every joint before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We check the floor slope first and set the tub on a level steel base angled toward the drain. We seal with flexible silicone and test with room-temperature and hot water to check every seam.
We inspect it visually and blow through to confirm no blockage. If it is clear and uncracked we use it, otherwise we run a new pipe from the tub to the trap beneath the floor.
