Drain and supply check
Outlet position and height confirmed before the unit is placed

Capital
Bathtub installation in Daiya begins by checking the waste outlet and confirming the pipe fall toward the floor trap. We level the unit perfectly, connect the waste securely, seal all joints with waterproof material and fill the tub to test for leaks.
Daiya flats near the British School have spacious master bathrooms with newly tiled walls. The bathtub in these units often sits far from main drainage pipes that run beneath the corridor, so we lay a new waste line across the floor tiles. We test the pipe fall with a probe before the tub is set, because any water pooling will cause odours within weeks.
Daiya in Kuwait governorate is known for modern flats with spacious bathrooms, an area where most installations require new waste pipes to be run.
We fill the bathtub to the rim with hot and cold water together for one full hour before handover to confirm zero leaks from pipes or joints.
Outlet position and height confirmed before the unit is placed
Bath feet adjusted until all four sides read level
Waste and overflow set fitted with a proper sealed gasket
Hot and cold lines connected with isolation valves and braided hoses
Non-fungal sanitary silicone along the full bath-to-tile joint
Unit filled and drained to verify every joint before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Slow leaks only show under prolonged water weight, not in quick tests. We fill it and leave it full for one hour while monitoring the joints and underfloor pipes through the access opening.
Only if the bathtub outlet sits higher than the existing trap. In that case we raise the floor slightly around the tub or install a compact waste pump directly under it.
