Position and height
Basin set at a practical height and checked level before any connection is made.

Capital
Ablution basin installation in Daiya begins by understanding the compact guest bathroom layout in villas and low-rise flats. We set the correct height, route hot and cold supply from the wall, connect waste to the trap and test all joints before leaving.
Daiya homes near the British School have compact guest bathrooms with tight space and low walls. We fit a wall-hung basin anchored with heavy-duty brackets to the masonry, run supply lines parallel to existing horizontal waste pipe. If the floor trap sits far away, a simple waste run under tiles with steady fall toward the outlet keeps drainage clean.
Daiya lies in Kuwait governorate near Daiya Park and international schools, a district of mid-sized residential flats and villas.
We fill the basin completely and open the drain because narrow bowls reveal corner leaks quickly during testing.
Basin set at a practical height and checked level before any connection is made.
Trap and rubber seal fitted so waste drains fully with no odour return.
Braided flexible tails connected to isolation valves for future servicing.
Single-lever or separate taps set with PTFE tape and thread compound at every joint.
Non-fungal sanitary silicone applied along the full basin perimeter to keep moisture out.
Flow confirmed and every joint inspected for drips before the technician leaves.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We use deep-set anchors into the concrete with metal washers to spread the load. Before drilling we check for existing water pipes running inside the wall.
If the distance is short, yes, with steady fall toward the new trap. Long runs need an intermediate inspection chamber, which means more tile breaking underneath.
