Drain and supply check
Outlet position and height confirmed before the unit is placed

Capital
A new bathtub in Jaber Al-Ahmad City starts with assessing the foundation and waterproofing in a newly built bathroom. We level the floor, install the tub, connect supply and drain, and pressurize the entire system.
New apartments and villas in Jaber Al-Ahmad City arrive with modern bathroom layouts and flat ready-made floors for bathtub placement. Drain lines are built into walls and foundations here, requiring precise measurements before final sealing. We verify the internal drain slope at the tub base and test the sealant and waterproofing around edges before water fill.
Jaber Al-Ahmad City is a new residential development in Kuwait governorate with units built to current bathroom standards.
Before handover, we test the sealant between tub and walls with wet gauze to ensure no water seeps behind it.
Outlet position and height confirmed before the unit is placed
Bath feet adjusted until all four sides read level
Waste and overflow set fitted with a proper sealed gasket
Hot and cold lines connected with isolation valves and braided hoses
Non-fungal sanitary silicone along the full bath-to-tile joint
Unit filled and drained to verify every joint before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
If the building is new, waterproofing is usually already under the original tiles. We inspect this layer around the tub location and repair any damage, then add flexible sealant to all edges.
Modern sealant dries at the surface in one hour but needs at least three hours before water exposure. We leave written instructions for every customer upon completion.
