Drain and supply check
Outlet position and height confirmed before the unit is placed

Capital
Bathtub installation in Mirqab near Mirqab Mall and the Central Market requires studying the existing bathroom floor for slope and soundness. We remove the old tub, prepare the floor, lay a new concrete base with fall that ensures quick drainage and seal everything with silicone and moisture-resistant materials.
Old houses in Mirqab near the Grand Mosque have bathroom floors of aged tiles that may hide cracks or a soft base beneath. Before setting the new tub we inspect the floor carefully with a metal rod to confirm no voids hide under the tiles. If we find cracks in the concrete we lift the tiles around the drain, repair the concrete with strong mortar and restore the correct fall toward the drain. This ensures the new tub will not sink over time.
Mirqab is a mixed residential and commercial district in Kuwait City near Mirqab Mall and the Central Market, where old houses stand next to modern shops and offices.
After pouring the concrete base we leave it at least eight hours before setting the tub to ensure full hardening.
Outlet position and height confirmed before the unit is placed
Bath feet adjusted until all four sides read level
Waste and overflow set fitted with a proper sealed gasket
Hot and cold lines connected with isolation valves and braided hoses
Non-fungal sanitary silicone along the full bath-to-tile joint
Unit filled and drained to verify every joint before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We lift the old tub carefully without disconnecting old pipes, inspect the floor beneath it, and if it is solid and dry we lay only a thin concrete base around the drain. We keep the surrounding tiles and mount the new tub at the same level.
We open the drain and remove sediment by hand or high-pressure water jet. We check the vertical pipe below the floor to confirm no deeper blockage. Then we install the tub and the new line discharges straight into the clean drain.
