Drain and supply check
Outlet position and height confirmed before the unit is placed

Capital
Bathtub installation in Abdullah Al-Salem begins with checking the bathroom floor and ensuring the base is level before positioning the tub unit. We run hot and cold supply lines, connect the drain and test all joints under pressure.
Most Abdullah Al-Salem villas have a spacious main bathroom with good floor height, allowing waste pipe runs under the floor to the main stack without difficulty. We test the drain fall from its outlet before choosing the tub position, because any misalignment will trap standing water after use. A raised bathtub on a metal frame improves access to pipework and makes future maintenance simpler.
Abdullah Al-Salem lies in Kuwait governorate near the British Embassy, a modern villa district where primary bathrooms are built with generous space.
We fill the tub and let water flow for several minutes to verify the drain has no leaks at any joint.
Outlet position and height confirmed before the unit is placed
Bath feet adjusted until all four sides read level
Waste and overflow set fitted with a proper sealed gasket
Hot and cold lines connected with isolation valves and braided hoses
Non-fungal sanitary silicone along the full bath-to-tile joint
Unit filled and drained to verify every joint before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, if the drain can fall steadily towards the main stack beneath the floor. We measure the available fall and either extend new pipes or reuse existing ones where possible, then test the full flow.
A metal frame raises the tub slightly, allows airflow underneath and gives easier access to drain and supply pipes. Direct tile mounting is quicker but hides the pipes and complicates repair work if problems arise later.
