Drain and supply check
Outlet position and height confirmed before the unit is placed

Mubarak Al-Kabeer
Bathtub installation in Qosor requires checking existing pipes and ensuring the waste line slopes steadily toward the header. We level the tub, connect waste and supply, seal the joints and fill it completely, then test under full pressure.
Qosor, in southern Mubarak Al-Kabeer, has family houses with relatively spacious bathrooms and slightly raised floors, and drains are usually positioned regularly. However, hot water supply lines sometimes run through the outer wall and may need rerouting. We measure from the existing drain outlet and set the tub so the fall is adequate without added supports, and test cold and hot water separately before final joint assembly.
Qosor sits in the southern part of Mubarak Al-Kabeer governorate, a quiet residential district away from industrial zones.
We check supply lines with separate hydraulic pressure because some houses use roof tanks that provide variable pressure.
Outlet position and height confirmed before the unit is placed
Bath feet adjusted until all four sides read level
Waste and overflow set fitted with a proper sealed gasket
Hot and cold lines connected with isolation valves and braided hoses
Non-fungal sanitary silicone along the full bath-to-tile joint
Unit filled and drained to verify every joint before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, if the extra run is short and the wall has no heavy reinforcement. We extend the pipe from the existing line and test it with hot water before connecting to the tub.
We insert thin plastic or metal shims under one end of the tub until we achieve a steady fall of two centimetres per metre. Then we test water drainage to confirm it does not sit.
