Drain and supply check
Outlet position and height confirmed before the unit is placed

Mubarak Al-Kabeer
Bathtub installation in Sabhan Industrial often serves worker facilities or warehouses. We check the concrete base for prior seepage, set the tub perfectly level, connect waste and supply, seal every joint with strong silicone and test under high pressure.
Warehouses and factories in Sabhan Industrial have thick concrete floors and very deep central drainage. The tub serves changing rooms or offices, and the existing drain may be distant from where the tub sits. We lay a new waste line within or over the concrete using flexible pipe if needed, and ensure the fall is correct along the entire route. We test the drain at full flow with water before handing over.
Sabhan Industrial Area in Mubarak Al-Kabeer governorate is dedicated to warehouses and heavy manufacturing.
Drain lines in Sabhan are tested at low pressure for ten minutes because thick floors can conceal slow seepage.
Outlet position and height confirmed before the unit is placed
Bath feet adjusted until all four sides read level
Waste and overflow set fitted with a proper sealed gasket
Hot and cold lines connected with isolation valves and braided hoses
Non-fungal sanitary silicone along the full bath-to-tile joint
Unit filled and drained to verify every joint before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, we use sturdy flexible pipes and support them on metal brackets. However, the tub then sits slightly above the normal floor level, and we may need to build a small platform under it.
Plastic pipe is adequate if thick and supported, and costs less. However, in hot warehouses plastic may expand slightly, so we choose metal in areas with high heat exposure.
