Drain and supply check
Outlet position and height confirmed before the unit is placed

Farwaniya
Bathtub installation in Rabiya depends on checking the old drain and confirming it bears the weight of a water-filled bathtub. We select the right position, run pipes and test slope and leaks before work is finished.
Most Rabiya residential houses date back decades and ground bathrooms are built traditionally with deep floor traps. A bathtub must be placed carefully because old floors may be unstable or drains may be partially blocked. We run test water first and measure drain speed; if slow, we heat pipes or extend the waste run to another trap.
Rabiya is in Farwaniya, a relatively older residential area where existing drainage networks need periodic inspection.
We pressure-test each joint at six bar for one minute before filling the bathtub because old pipes may leak under pressure.
Outlet position and height confirmed before the unit is placed
Bath feet adjusted until all four sides read level
Waste and overflow set fitted with a proper sealed gasket
Hot and cold lines connected with isolation valves and braided hoses
Non-fungal sanitary silicone along the full bath-to-tile joint
Unit filled and drained to verify every joint before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We inspect the floor first by walking and listening for cracking sounds. If the floor is sound, we will place the bathtub with strong support under the base to distribute weight evenly.
Yes, we carefully open the trap and remove debris and sediment by hand or with a drain-clearing machine. We then re-test drainage before securing the bathtub.